Beginning in early November 2017, PSE&G will be working in Millburn to replace aging cast iron gas pipes with new, durable plastic and/or coated steel piping – ensuring the continued safety and reliability of our gas system well into the future.

Work will take place Monday through Saturday between the hours of 7 a.m. and 4 p.m., conditions permitting. The gas main replacement portion of the work is expected to take place through July of 2018.

Work will take place Monday through Friday between the hours of 7 a.m. and 5 p.m., with the potential for Saturday work. The gas main replacement and services portion of the work is expected to take place through the end of the year. If you reside on one of the streets listed below more information will be coming directly to your home.

If you have questions please contact our dedicated GSMP line at 1-833-661-6300 and leave a message. Below are the streets where work will take place: Red (completed), Blue (In Progress), Green (Not yet started)

Street

Between Street 1

Between Street 2

Arden Pl

Briarwood Dr

Dorset Ln

Briarwood Dr

Long Hill Dr

White Oak Ridge Rd

Country Day Dr

Briarwood Dr

End

Dale Dr

Long Hill Dr

End

Dorset Ln

White Oak Ridge Rd

Longhill Dr

Hobart Gap Rd

Morris Turnpike

Morris Ave

Lee Ter

Long Hill Dr

200' EO Robert Dr

Longhill Dr

300' SO Dorset Ln

350' NO Lee Ter

White Oak Ridge Rd

Morris Ave

Hartshown Dr