PSE&G to upgrade gas lines in Princeton

Go

PSE&G will be working in Princeton in March 2021 to replace aging cast iron gas pipes with new, durable plastic and/or coated steel piping – ensuring the continued safety and reliability of our gas system well into the future.

Work will take place Monday through Friday between the hours of 7 a.m. and 5 p.m., with the potential for Saturday work. The gas main replacement and services portion of the work will is expected to conclude in Fall 2021.

If you reside on one of the streets listed, more information will be coming directly to your home.

If you have questions, please call our dedicated Gas Construction hotline at 1-833-661-6400 and leave a message.

Below are the streets where work will take place: Red (completed), Blue (In Progress), Green (Not yet started)

Phase 1

Street

Between Street 1

Between Street 2

Prospect Ave EXT

Kingston Rd

Riverside Dr

Evergreen Cir

Prospect Ave EXT

End

Riverside Dr

Kingston Rd

Prospect Ave

Adams Dr

Riverside Dr

Riverside Dr

Vernon Cir

Riverside Dr

End

PRW 30

Riverside Dr

End

Woodside Ln

Riverside Dr

Prospect Ave

Mason Dr

Woodside Ln

Woodside Ln

Phillip Dr

Prospect Ave

Riverside Dr

Phillip Dr

Riverside Dr

End

Hemlock Cir

Phillip Dr

Phillip Dr

Howe Cir

Riverside Dr

End

Prospect Ave

Riverside Dr

Riverside Dr W

Castle Howard Ct

Prospect Ave

End

Riverside Dr W

Prospect Ave

Kingston Rd

Sturges Way

Riverside Dr W

End

Robert Rd

Riverside Dr W

Prospect Ave

Forester Dr

Robert Rd

End

Lake Dr

Riverside Dr

Hartley Ave

Longview Dr

Riverside Dr

Lake Dr

Knoll Dr

Lake Dr

600' WO Lake Dr

Dogwood Ln

Longview Dr

Lake Dr

Longview Dr

Lake Dr

End

Hartley Ave

Lake Dr

S Harrison St

Maclean Dr

Hartley Ave

Hartley Ave

Mccosh Cir

Hartley Ave

Hartley Ave

Balsam Ln

Riverside Dr

Sycamore Rd

Sycamore Rd

Riverside Dr

Cedar Ln

Cedar Ln

Southern Way

Sycamore Rd

Prospect Ave

Riverside Dr

S Harrison st